Syllabus

Calibration & Instrumentation (C&I)

Duration - 15 Days (3Hrs Per Day)

  • Basics of Process Control Instrumentation

  • Calibration and Familiarization of Pressure Measuring Instrument

  • Calibration and Familiarization of Level Measuring Instrument

  • Familiarization of Flow Measuring Instrument

  • Calibration of Temperature Measuring Instrument

  • Control Valves

  • Calibration and Familiarization of Transmitters: Pressure, Flow, Level & Temperature

    • Pneumatic

    • Electronic

    • HART

    • SMART

Certified Instrumentation Engineer (CIE)

Duration: 45 Days (3Hrs Per Day)

  • Basics of Process Control Instrumentation

  • Calibration and Familiarization of Pressure Measuring Instrument

  • Calibration and Familiarization of Level Measuring Instrument

  • Familiarization of Flow Measuring Instrument

  • Calibration of Temperature Measuring Instrument

  • Control Valves

  • Calibration, Loop Checking, Functional Testing, Trouble Shooting and Mainenance of Field Instruments

  • Calibration and Familiarization of Transmitters: Pressure, Flow, Level & Temperature

    • Pneumatic

    • Electronic

    • HART

    • SMART

  • Calibration, Trouble shooting and maintenance of control valves

  • Relay

  • Instrument Installation Material Familiarization

  • Instrument I/O wiring and interfacing of field instrument with control Systems

  • Field Documentation

    • Piping & Instrument Diagram

    • Instrumentation Wiring Diagram, Instrument Index and data sheet

Post Graduate Diploma in Industrial Instrumentation (PGDII)

Duration: 90 Days (3Hrs Per Day)

  • Basics of Process Control Instrumentation

  • Calibration and Familiarization of Pressure Measuring Instrument

  • Calibration and Familiarization of Level Measuring Instrument

  • Familiarization of Flow Measuring Instrument

  • Calibration of Temperature Measuring Instrument

  • Control Valves

  • Calibration, Loop Checking, Functional Testing, Trouble Shooting and Mainenance of Field Instruments

  • Calibration and Familiarization of Transmitters: Pressure, Flow, Level & Temperature

    • Pneumatic

    • Electronic

    • HART

    • SMART

  • Calibration, Trouble shooting and maintenance of control valves

  • Relay

  • Instrument Installation Material Familiarization

  • Instrument I/O wiring and interfacing of field instrument with control Systems

  • Field Documentation

    • Piping & Instrument Diagram

    • Instrumentation Wiring Diagram, Instrument Index and data sheet

    • Hookup Diagram

    • Instrument individual specification

    • Instrument Index, Instrument data sheet

    • Instrument Location layout/ Instrument JB layout, cable tray routing layout, cable routing layout

    • Cause and effect diagram/ shutdown matrix , Alarm and trip settings

    • Area classification and various protections

  • HSE Induction

  • Miscellaneous

    • Proximity Sensors, Vibration Sensors and Switches, PID Controllers, Fire and Gas Detection System

  • Add – On Automation

    • Programmable Logic Controller (PLC) - Allen Bradley, Omron

    • Supervisory Control and Data Acquisition (SCADA) - Wonderware InTouch

  • Maintenance, Implementation, Troubleshooting and Interfacing of field instrument with control Systems

Instrumentation QA QC

Duration: 45 Days (3Hrs Per Day)

  • Preparation of QC Procedures

  • General work Procedure(WP)

  • Documentation for Inspection

  • Documentation for Loop Checking

  • Work Scope Summary

  • Inspection and Testing

  • Mandatory HSE Training